Europe Power Transmission Outlook Report 2023: Insights into Current Network, Opportunities and Future Projects Until 2030 – ResearchAndMarkets.com

europe-power-transmission-outlook-report-2023:-insights-into-current-network,-opportunities-and-future-projects-until-2030-–-researchandmarkets.com

DUBLIN–(BUSINESS WIRE)–The “Power Transmission in Europe & Outlook 2030” report has been added to ResearchAndMarkets.com’s offering.


This report offers a thorough analysis of the Power Transmission in Europe, providing valuable insights into the current state of the network and upcoming projects scheduled until 2030. The study is conducted on a country-by-country basis, examining each region to identify key opportunities that exist until 2030.

Power Transmission in Europe is set to receive a significant boost as The European Union has agreed to invest €1.037 billion (USD 1.18 billion) in five cross-border infrastructure projects under the Connecting Europe Facility (CEF) for trans-European energy networks. The CEF will provide financial support for four construction projects and one study.

The largest share of the funding, €657 million (USD 746 million), has been allocated to the EuroAsia interconnector project, which aims to establish the first electricity interconnection between Cyprus and the European grid. The construction project includes 3 projects for electricity transmission as follows: The EuroAsia interconnector project is an ambitious electricity infrastructure project that will interconnect the transmission networks of Cyprus and Greece, effectively ending the energy isolation of Cyprus.

The project involves laying approximately 898 km of undersea cables, which will set new world records for a project of this kind due to the maximum sea pth of 3000 meters. Baltic Synchronisation Project Phase II (€170 million or USD 192 million).

The Baltic Synchronisation project, which aims to integrate the power grids of Estonia, Latvia, Lithuania, and Poland with the wider European grid, has received further funding under the second phase of the Connecting Europe Facility (CEF) program. This funding will be used to reinforce the grid in Poland and upgrade the transmission infrastructure in Lithuania, Latvia, and Estonia. Aurora Line (€127 million or USD 143 million).

The Connecting Europe Facility (CEF) will fund the development of a third transmission line between Sweden and Finland, increasing electricity transmission capacity and integrating onshore and offshore renewable electricity.

A selection of companies mentioned in this report includes

  • 50Hertz Transmission
  • General Electric
  • ABB Power Grids
  • Siemens
  • OFGEM
  • TenneT
  • TransnetBW
  • Scottish and Southern Electricity Networks
  • Energinet
  • Fingrid
  • Scottish Hydro Electric Transmission plc
  • EirGrid
  • Terna
  • Reseau de Transport d’Electricite – France TSO

For more information about this report visit https://www.researchandmarkets.com/r/3zk4ab

About ResearchAndMarkets.com

ResearchAndMarkets.com is the world’s leading source for international market research reports and market data. We provide you with the latest data on international and regional markets, key industries, the top companies, new products and the latest trends.

Contacts

ResearchAndMarkets.com

Laura Wood, Senior Press Manager

[email protected]
For E.S.T Office Hours Call 1-917-300-0470

For U.S./ CAN Toll Free Call 1-800-526-8630

For GMT Office Hours Call +353-1-416-8900

For more than 50 years, Business Wire has been the global leader in press release distribution and regulatory disclosure.

For the last half century, thousands of communications professionals have turned to us to deliver their news to the audiences most important to their business through the sources they trust most. Over that time, we've gone from a single office with one full time employee to more than 500 employees in 32 bureaus.